Atlantis, The Palm is a five-star ocean-themed resort hotel on the apex of the man-made Palm Island’s crescent, Dubai, UAE. The building was the first to be built on the island and is based around the myth of Atlantis, as depicted in the works of Plato. The main building has two central towers, referred to as East and West, joined together by the Royal Bridge Suite.
The 46 hectare resort comprises 1,539 rooms, 23 restaurants, luxury boutiques, and a 17 hectare nautical-themed water park and tropical gardens containing more than 250,000 plants and trees. A key feature of the water park is the Leap of Faith slide; a 60 ft drop at an 86-degree angle from the top of a replica Mayan temple. It propels riders through a clear acrylic tunnel submerged in a shark-filled lagoon.
The resort includes one of the largest open-air marine habitats in the world, containing approximately 65,000 marine animals in lagoons and other displays. Three-storey underwater suites allow guests to literally ‘sleep with the fishes’.
Atlantis was developed as a joint venture between Kerzner International Holdings Ltd. and Istithmar, and officially opened in September 2008. The construction cost was reported to be US$1.5 bn. In April 2012, Istithmar acquired Kerzner’s 50% stake in the property for US$ 250m. The property continues to be managed by Kerzner International Resorts.
Atlantis has become a landmark tourist attraction and an iconic symbol of Dubai’s place on the world-stage.
[edit] Design and construction
Atlantis was designed by Wimberly, Tong and Goo, an international firm specialising in luxury hotel complexes.
The design incorporates classical Arabian architecture in both the interior and exterior of the 23-storey hotel, with semi-precious stones, intricate fossilised shells and 'fish' stones included throughout. A 10 m-high glass sculpture by artist Dale Chihuly contains more than 3,000 pieces of intensely-coloured blown glass ranging from fiery oranges and reds to tranquil blues and greens, surrounded by a reflection pool. The hotel lobby's 19 m-high arched ceilings feature 8 hand-painted murals by Spanish artist Albino Gonzalez.
The contractor, Laing O’Rourke, developed the hotel envelope using a modular precast glass-fibre/reinforced concrete façade, which was installed by their in-house specialists Emirates Precast. They also developed a pioneering facility to pre assemble modular bathroom ‘pods’ in a controlled factory environment. 1,500 pods were delivered direct to the site and installed at a rate of 38 per week.
The logistical operation to facilitate the build of the intricate design presented challenges. A highly complex operation was set up involving road deliveries, handling and distribution, temporary utilities, communication systems, traffic management and an enormous amount of on-site labour. At its peak, a workforce of 10,000 were employed, working 2 million hours a month.
It was completed 2 months ahead of schedule.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Building of the week series.
- Burj al Arab, Dubai.
- Luxor Las Vegas.
- MahaNakhon, Bangkok.
- Petronas Twin Towers.
- Ryugyong Hotel, North Korea.
- Shanghai Tower.
- Taipei 101.
- Top 10 skyscrapers located in the UAE.
- Top Architectural Wonders of Dubai.
- Unusual building design of the week.
[edit] External resources
- Atlantis, The Palm - Official site
- Laing O'Rourke - Atlantis
Featured articles and news
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.